[Page 3 of 3]
|
|
|
 |
 |
 |
| The installation
of 14 Hänel Rotomat vertical carousels with Hänel software has
had the following effect: |
 |
  |
Processing
times in the pc board assembly plant were slashed by 80%! |
 |
 |
  |
Stocks
of finished goods were cut by more than 60%! |
 |
 |
  |
In-process
hours were reduced from 5000 to 1000! |
|
|
  |
|
 |
| All expectations fulfilled |
 |
| The changes made to its materials flow
system and associated information technology had a tremendous impact on
MARQUETTE HELLIGE - manufacturers of electro-medical equipment based in
Freiburg with a workforce of 800: |
 |
| Within only a few months, job processing
times in the pc board assembly plant were slashed from an average of 55
working days to below 10! |
 |
| The in-process hours booked to the cost
center were reduced from 5000 to 1000! |
 |
| A high degree of flexibility was attained
in the assembly process. The stocks of finished goods have been cut by more
than 60%; problems with delivery times are now unheard of! |
 |
| MARQUETTE HELLIGE has reached these
objectives by installing a Hänel Rotomat system. |
 |
| An approach that meets market demands |
 |
| This means reducing idle times, integrating
small-scale work processes, abolishing 'unnecessary' work processes, synchronizing
organization more effectively, minimizing setup times. |
 |
| A comprehensive process analysis revealed
two problem areas: |
 |
| 1. |
Linking up a production-oriented
PC environment to the host |
| 2. |
Establishing an efficient,
segment-integrated materials management system. |
 |
 |
|
| Lack of space dictated that materials
needed to be stored in vertical carousels. The market analysis directed
MARQUETTE HELLIGE to Hänel who took on general contractor status for installing
a system of this kind. |
 |
| The practical approach in
final assembly: |
 |
| The manufacturing process
is organized in group work, and the materials are assigned to
the workstations in such a way that the assembly workers each
have their materials close at hand. They take the materials
from their storage units as they are needed. |
 |
| Each group has Hänel's inventory
management software, of which the most important functions are: |
 |
  |
Online
transfer of production orders from the host! |
  |
Inventory
management for each storage location! |
  |
Combining
small jobs to form a current work order covering several
variants that are assembled together! |
  |
Issuing
replenishment requests to the parts store according to
the Kanban principle when the materials for a position
are not all carried in the segment store for reasons of
volume! |
  |
Processing
of individual retrievals! |
  |
Inventory
update! |
  |
Support
for the modification service, etc.! |
  |
Compiling
statistics! |
|
|
|
|
 |
| Hänel's inventory management software
controls the Rotomat carousel system. The carousel control unit guides the
operating personnel through the store with route optimization. |
 |
| The conventional warehousing system
was replaced by a paperless order picking system ideally suited to the production
process. The organization of stock outages, which used to be on a job-related
basis, was also abolished. The finished-goods store now contains only small
quantities of variants for which there is a continuous demand on the market. |
 |
| The assets tied up in inventory have
been reduced by several million Euros, the rate of turnover has tripled. |
 |
| The example of MARQUETTE HELLIGE shows
that using Hänel's storage and inventory control systems contributes positively
to the economic success of a company. |
 |
 |
 |
|
|
| |